Process

By date

Events by date
Time (UTC)StageWhoWhat happenedRecordsSession
2026-10-23T00:52ZbrainstormFadel M. MegahedM3 (R package decisionqc) starts with a brainstorm, while the paper tasks of Claude Code are on hold (D135). fmm gave the first scope: two routes (ellmer and httr2, or a C or Rust backend), JEV-like models for text and images, open models through Ollama, Hugging Face and llama.cpp, calibration, reports of performance, cost and speed, and a GUI. Outside the package: a vignette, a Shiny app on a Hugging Face Space that runs on a CPU, and an agent skill that optimizes the descriptions.-b36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-10-23T03:36ZplanClaude Code (Opus 5.5)The brainstorm of M3 ends: fmm approved the design of the R package decisions (D183), after D136 to D182. A fresh reviewer read the design as a builder; fmm answered its open questions and 15 open items with multiple-choice questions. Claude Code now writes the implementation plan.plans/2026-10-23-decisions-package-design.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-10-23T03:50ZbuildClaude Code (Opus 5.5)fmm approved the plan of the package decisions and chose subagent-driven execution (D187). Claude Code builds the package task by task, with a fresh implementer and a review for each task, in the local folder decisions (back-filled).plans/2026-10-23-decisions-package-plan.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-10-24T01:31ZevaluateClaude Code (Opus 5.5)Vignette 5 reaches its one-time test. Tasks 1 to 12b are reviewed; the four gpt-6-luna loops are blind (D197); the 15 setups are fixed by an md5 manifest and calibrate with Platt targets (D200). A dry run checked the setups and the 1,028 test rows per model with no call. evaluate_once() now scores the test rows of Jev, gpt-6-luna and Clef-Flash once.project/decisions.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-10-24T03:03ZbuildClaude Code (Opus 5.5)The package decisions is built and reviewed (Tasks 1 to 13 of the plan): 14 exported functions, six vignettes, four datasets and the agent skill. A final whole-branch review found no critical issue; its fixes passed a scoped re-review. R CMD check --as-cran gives 0 errors and 0 warnings. A clean-session rerun of vignette 5 from its state files sent 0 requests and gave byte-identical results. Claude Code hands the package folder to fmm for the test with the code of vignette 5 (D158).plans/2026-10-23-decisions-package-plan.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-10-24T15:14ZbuildClaude Code (Opus 5.5)End of milestone M3: the package decisions 0.1.0 passed the final checks on 141eb1d (local --as-cran, GitHub Actions, R-hub and win-builder: only the new-submission note), and fmm submits it to CRAN. The build ledger, with the CRAN preparation and the commit map of D206, is copied to the record (D204).plans/2026-10-23-decisions-package-ledger.md, project/roadmap.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-10-28T01:51ZbrainstormClaude Code (Opus 5.5)fmm answers the seven questions on the TypeSafe Box primitive (D268 to D274). Milestone M7 starts: a Box study first, then Box in the package and the Space. Claude Code measures the image tokens of jev-1.14.0 under the new budget row before the design.project/decisions.md, project/roadmap.md, calls/README.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-11-09T18:54ZbuildClaude Code (Opus 5.5)CRAN publishes decisions 0.1.0 (2026-11-08) with the code of commit b25fc9f. fmm chooses four updates (D299). The package gets the CRAN install in its README, the tag v0.1.0, a GitHub release and the development version 0.1.0.9000. The Space becomes version 1.0.2 and installs decisions from CRAN. A GitHub Actions outage (18:23Z to 18:43Z) stopped four runs; each passed when it ran again.project/decisions.mdc7967fb8-5f82-4637-9290-7a9c157ceeb5

By stage

brainstorm

Events in stage brainstorm
Time (UTC)StageWhoWhat happenedRecordsSession
2026-10-23T00:52ZbrainstormFadel M. MegahedM3 (R package decisionqc) starts with a brainstorm, while the paper tasks of Claude Code are on hold (D135). fmm gave the first scope: two routes (ellmer and httr2, or a C or Rust backend), JEV-like models for text and images, open models through Ollama, Hugging Face and llama.cpp, calibration, reports of performance, cost and speed, and a GUI. Outside the package: a vignette, a Shiny app on a Hugging Face Space that runs on a CPU, and an agent skill that optimizes the descriptions.-b36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-10-28T01:51ZbrainstormClaude Code (Opus 5.5)fmm answers the seven questions on the TypeSafe Box primitive (D268 to D274). Milestone M7 starts: a Box study first, then Box in the package and the Space. Claude Code measures the image tokens of jev-1.14.0 under the new budget row before the design.project/decisions.md, project/roadmap.md, calls/README.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58

plan

Events in stage plan
Time (UTC)StageWhoWhat happenedRecordsSession
2026-10-23T03:36ZplanClaude Code (Opus 5.5)The brainstorm of M3 ends: fmm approved the design of the R package decisions (D183), after D136 to D182. A fresh reviewer read the design as a builder; fmm answered its open questions and 15 open items with multiple-choice questions. Claude Code now writes the implementation plan.plans/2026-10-23-decisions-package-design.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58

build

Events in stage build
Time (UTC)StageWhoWhat happenedRecordsSession
2026-10-23T03:50ZbuildClaude Code (Opus 5.5)fmm approved the plan of the package decisions and chose subagent-driven execution (D187). Claude Code builds the package task by task, with a fresh implementer and a review for each task, in the local folder decisions (back-filled).plans/2026-10-23-decisions-package-plan.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-10-24T03:03ZbuildClaude Code (Opus 5.5)The package decisions is built and reviewed (Tasks 1 to 13 of the plan): 14 exported functions, six vignettes, four datasets and the agent skill. A final whole-branch review found no critical issue; its fixes passed a scoped re-review. R CMD check --as-cran gives 0 errors and 0 warnings. A clean-session rerun of vignette 5 from its state files sent 0 requests and gave byte-identical results. Claude Code hands the package folder to fmm for the test with the code of vignette 5 (D158).plans/2026-10-23-decisions-package-plan.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-10-24T15:14ZbuildClaude Code (Opus 5.5)End of milestone M3: the package decisions 0.1.0 passed the final checks on 141eb1d (local --as-cran, GitHub Actions, R-hub and win-builder: only the new-submission note), and fmm submits it to CRAN. The build ledger, with the CRAN preparation and the commit map of D206, is copied to the record (D204).plans/2026-10-23-decisions-package-ledger.md, project/roadmap.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58
2026-11-09T18:54ZbuildClaude Code (Opus 5.5)CRAN publishes decisions 0.1.0 (2026-11-08) with the code of commit b25fc9f. fmm chooses four updates (D299). The package gets the CRAN install in its README, the tag v0.1.0, a GitHub release and the development version 0.1.0.9000. The Space becomes version 1.0.2 and installs decisions from CRAN. A GitHub Actions outage (18:23Z to 18:43Z) stopped four runs; each passed when it ran again.project/decisions.mdc7967fb8-5f82-4637-9290-7a9c157ceeb5

evaluate

Events in stage evaluate
Time (UTC)StageWhoWhat happenedRecordsSession
2026-10-24T01:31ZevaluateClaude Code (Opus 5.5)Vignette 5 reaches its one-time test. Tasks 1 to 12b are reviewed; the four gpt-6-luna loops are blind (D197); the 15 setups are fixed by an md5 manifest and calibrate with Platt targets (D200). A dry run checked the setups and the 1,028 test rows per model with no call. evaluate_once() now scores the test rows of Jev, gpt-6-luna and Clef-Flash once.project/decisions.mdb36ad167-66f5-45af-9d6c-bf3f817c6f58